All field resultsRelleno Sanitario Doña Juana

A maintenance program with fewer failures.

Landfill equipment and corrosion-control program · Duravi Grease + anti-corrosive treatment

Maintenance programSix months
Maintenance work on a Caterpillar bulldozer in the documented program
Equipment maintenance · source case photograph
66%

lower reported machine failure rate

Six-month reported outcome

Reported under the documented application conditions.

Equipment, test method + conditions
Application
Landfill equipment and corrosion-control program
Duravi product
Duravi Grease + anti-corrosive treatment
Baseline / comparison
Six-month reported outcome
Test method
Reported maintenance-program comparison after six months.
Measured result
The case summary reports a 66% lower machine failure rate, alongside 35% less grease use and six fewer downtime hours per machine per month.
Observation period
Six months
Evidence type
Reported field application
Source
Duravi product line and field case studies · page 17
The challenge

The maintenance
problem.

Leachate exposure caused corrosion across equipment and facilities at a Bogotá landfill. Duravi grease and anti-corrosive treatment were applied to Caterpillar D8 bulldozers, lids and railings.

The application

The case summary reports a 66% lower machine failure rate, alongside 35% less grease use and six fewer downtime hours per machine per month.

What changed for the operator

Reliability and maintenance workload improved together in the reported program.

Your application

Working on
similar equipment?

Share your equipment, operating conditions and current product to discuss whether this treatment is suitable.